Welcome to The Workdry Group. It looks like you're in North America.

Click here to visit the Holland Pump website
The Workdry Group

Case studies from across our group

Water Holland Pump

Bypass Pumping at League City

See how Holland Pump delivered a seamless 4-pump bypass solution for League City's lift station rehabilitation project.

Read more
Industrial Siltbuster

From Fragile to Future-Proof: Moderinsing Wastewater Treatment at Aberlour Distillery

See how a phased DAF and MBBR20 Siltbuster solution upgraded Aberlour Distillery's ageing and fragile wastewater treatment process.

Read more
Siltbuster HB50MR Units at Shoreham Wastewater Treatment Works
Water Selwood Siltbuster

Delivering integration: A Two-Phase Bypass and Wastewater Treatment Solution

Southern Water engaged Selwood and Siltbuster to support a programme of planned maintenance and repair works on key assets at the treatment works.

Read more
Infrastructure Siltbuster

Silty Surface Water Run-Off in The North East of England

Discover how a Durham housebuilding project effectively treated silty surface water run-off using a Siltbuster HB20 lamella clarifier to meet Northumbrian Water discharge limits.

Read more
Infrastructure Siltbuster

Neutralising High-pH Concrete Washwater

See how Malin Floors treated high-volume concrete chute washdown water using settlement skips and automated pH neutralisation prior to site discharge.

Read more
Water Siltbuster

Protecting Surface Watercourses: Llanishen Reservoir

Discover how automated 24/7 chemical dosing and continuous TSS monitoring protected a local brook during the Llanishen Reservoir drawdown for Welsh Water.

Read more
Infrastructure Siltbuster

Two-Stage Water Dosing & Treatment at £2B West Midlands Interchange

Learn how Siltbuster replaced a failing water treatment system at the £2B West Midlands Interchange to treat silty surface run-off and ensure Environment Agency compliance.

Read more
Infrastructure Siltbuster

Dissolved Iron Removal for Humber Pipeline Tunnel

Find out how Siltbuster designed and rapidly mobilised a high-flow three-stage iron removal water treatment system capable of treating up to 120 cubic metres an hour.

Read more
Water Siltbuster

600m3/hr Silt Reservoir Treatment

Discover how an 8-clarifier Siltbuster system with mixing tanks and chemical dosing containers treated 500,000 m³ of water during Welsh Water's Wentwood Reservoir upgrades.

Read more
Infrastructure Siltbuster

Modular, Plug-and-Play Clarification Systems for Complex Clay Runoff

How Siltbuster provided modular plug-and-play water treatment for the Carlisle Southern Link Road project, effectively managing colloidal clay runoff and protecting local watercourses.

Read more
Water Siltbuster

High-Flow Chemical Dosing & Clarification for Pipeline Flush Water

Discover how Siltbuster delivered a 350m³/hr modular dosing and clarification system to treat chalk-contaminated washwater during a critical pipeline flush.

Read more
Infrastructure Siltbuster

Automated CO2 pH Neutralisation & Clarification for Concrete Demolition Wastewater

Siltbuster deployed a DS4 CO2 neutralisation unit and FB50 clarifier for Global Infrastructure to treat high-pH, silty wastewater at 10m³/hr.

Read more

Connect with our experts

Have a chat with our experts and discover how The Workdry Group can support you — no matter the scale or complexity