The Background
An existing Affinity Water pumping station and pipeline in Hemel Hempstead was located in an area undergoing significant development. Chalk-based sediment from the underlying aquifer had been mobilised as a result of drilling and piling works at adjacent construction sites. This meant the water pumped using the existing Affinity Water asset was contaminated with slow-settling suspended solids. Normally on this site, clearance pumping was carried out and the washwater could be discharged directly to the adjacent watercourse.
The Overall Objective
Due to local development work elevating the level of suspended solids in the aquifer, if this water had reached the nearby River Gade without treatment, it would unquestionably have harmed the aquatic ecosystem, and the discharge criteria within Affinity Water’s discharge permit would have been breached. Siltbuster equipment was required to maintain site compliance and to protect the environment.
The water mains pipeline was part of a live water supply to nearby residents and businesses, so it was critical that it could be cleaned and put back online as quickly as possible. Things were complicated further by very limited space and access onsite. The only area suitable to set up a mobile water treatment solution was on the floor slab of a demolished building, located at the end of a busy side road.
The Solution
Siltbuster designed and mobilised a 350m³/hr containerised two-stage flow proportional chemical dosing and solids removal system. The modular solution comprised two 20ft customised dosing containers, two 30m³ dosing tanks complete with mixers, and five HB50M lamella clarifier units.
Due to the access restrictions onsite, a crane had to be used to manoeuvre the units into place. The system was installed within three days and was operational seven days a week, for three weeks, maintaining consistent compliance while Affinity Water’s water main was pumped clean.
The pipeline washwater had to meet a discharge criteria of total suspended solids in a concentration of less than 50mg/l and a pH between 6 and 9. Siltbuster’s equipment worked so well that the washwater produced had a total suspended solids concentration of less than 10mg/l.