A Selwood SelTank and Siltbuster treatment units alongside each other on site at Shoreham Wastewater treatment works
A Selwood & Siltbuster Case Study

Delivering integration: A Two-Phase Bypass and Wastewater Treatment Solution

Water

Sector

Shoreham, UK

Location

Ongoing

Date

    The Results

    Reduced environmental and compliance risk at a highly sensitive coastal location.

    Demonstrated the flexibility and scalability of modular treatment solutions in a constrained operational site.

    Maintained operational continuity throughout the planned works, minimising disruption to site operations.

    Successful bypass of ageing assets, enabling essential maintenance and repair works to proceed safely and efficiently.

    Established a clear pathway for enhanced treatment capacity during Phase 2 of the project.

    Siltbuster HB50MR Units at Shoreham Wastewater Treatment Works
    Siltbuster HB50MR Units at Shoreham Wastewater Treatment Works

      Need support with a complex water challenge?