Projects | Holland Pump

Plant Maintenance & Bypass

Water

Sector

Houston, TX

Location

Sewer Bypass

Solution

Our Sewer Bypass Solutions

BPR required a highly reliable temporary pumping solution to maintain uninterrupted wastewater flow during a multi‑phase upgrade project. With no room for equipment failure and tight on-site space constraints, Industrial TX engineered a robust, monitored bypass system, navigated difficult installation conditions, and ensured full site accessibility throughout the project.

Challenge 3

The WWTP needed to maintain full access for 18‑wheel semi‑trucks, even as the temporary HDPE bypass pipe ran through critical traffic paths.

Solution 3

A ramp had to be built that was strong enough to hold the trucks as they traveled over the temporary HDPE bypass pipe that was pumping the waste to its next filtering stage.

Have a water challenge?

Speak directly with our expert team to size equipment, review site specs, and get a quote for your project