Safely managing groundwater and surface water for infrastructure projects
Few construction activities are possible without effective de-watering. Whether it’s groundwater displaced by groundworks, surface water accumulating after heavy rainfall, or more serious flooding, removing water in a controlled and compliant way is critical to every infrastructure project.
Under increasingly stringent requirements, including the need to ensure any wastewater discharged into the environment is within consent for contaminants including nitrates and phosphates, effective water treatment is more important than ever for every site.
Depending on site conditions and project requirements, de-watering may be a temporary measure during construction or part of a longer-term strategy to manage groundwater or surface flows. Sometimes sites need to deal with varying flows as seasons change or as the intensity of works ebbs and flows.
De-watering safely and compliantly
Removing water from a site is rarely as simple as pumping it away. De-watering can have significant environmental implications, especially where large volumes of groundwater are involved or where water is contaminated.
One of the main challenges is discharge quality. De-watered water often contains suspended solids, hydrocarbons, nitrates, phosphates or other contaminants picked up as it moves through soil or across exposed ground. Before discharge to surface water, ground or sewer, this water typically needs to be treated to meet consent limits.
In the UK, de-watering activities are tightly regulated. Discharging to surface water or ground may require an environmental permit from the Environment Agency, while discharge to the public sewer requires consent from the relevant water company. Sustainable de-watering strategies therefore combine monitoring, treatment and containment to minimise risk and maintain compliance.
As expectations around environmental protection increase and discharge regulations tighten, the need for well-designed, responsibly operated de-watering systems is only growing.
That means a modular approach makes sense. Using separate, plug-and-play units assembled off-site and configured precisely as required, Siltbuster’s specialists can design systems that meet the precise volumes, contamination types and flow rates of every site.
De-watering – a Siltbuster case study
Siltbuster is providing modular water treatment solutions to support the building of a new state-of-the-art hospital in one of the largest healthcare construction projects in the UK.
Our teams were engaged by the principal contractor for the scheme to design and deliver a solution to manage surface water runoff generated by extensive earthworks being carried out on site.
Effective treatment of this wastewater was essential to help minimise the environmental impact of the works on local watercourses, and to ensure the client remained within the requirements of its permit.
The challenge
During the early phases of the build, large areas of topsoil were removed to prepare the site for major structural works. This resulted in surface water runoff carrying high levels of suspended solids.
Siltbuster’s specialists were engaged around 18 months before work began on site to help design water management plans. The objective was to ensure the site could handle and treat all runoff to the required standard before discharge.
The solution
After calculating flows and analysing soil from the site, Siltbuster specified and installed a solution capable of ensuring the wastewater was clean at the point of discharge.
Two modular systems were installed, each able to handle 35 litres per second. Each was made up of a 20ft dosing container, which introduces flocculants and coagulants to help bind particles, an MT30 mix tank, and two HB50M lamella clarifiers to settle out the solids. The solutions included pH correction to neutralise any acidic content. Sludge pumps were fitted to each of the HB50M units to enable easy removal of the waste.
Over a particularly dry summer, the systems were put on standby. To aid capacity when water treatment resumed, Siltbuster installed an additional third identical setup and a fourth, smaller one comprising an iCDS, MT20 mix tank, and two HB50M clarifiers.
Clarity monitoring equipment was also installed to enable the client to view real-time information on the turbidity and pH of the outlet waters remotely via an online portal. This provides reassurance that the site remains in consent, increases efficiency and reduces environmental impact by limiting the number of visits to site required.
The result
Siltbuster’s modular treatment systems operate across multiple points on site, ensuring that runoff water is treated effectively and discharged well within consent limits.
Collaboration with the client from the early design phase through to installation and operation has allowed the project team to mitigate the risk of pollution and maintain compliance under challenging and evolving site conditions.
The client now has the ability to clean and discharge water at three key locations across the scheme, significantly reducing the environmental impact of the works and the risk of fines for non-compliance.
A smarter approach to de-watering
With the right combination of engineering expertise, modular treatment systems and real-time monitoring, de-watering can be managed efficiently – even on complex, high-risk sites.