A Siltbuster Case Study

600m³/hr Silt Reservoir Treatment

Water

Sector

Wentwood Reservoir, Wales, UK

Location

Discharge Point

Flooding of Tunnel with Ultra-Pure Water

Flow Rate

Up to 120m3/hr

Contamination

Dissolved Metals in Water

Wentwood Reservoir in South Wales had a Victorian control tower with 18th-century valves which needed to be removed and replaced, bringing it up to current working standards. To gain access to the base of the tower, over 500,000 m3 of water needed to be drained from the 42-acre reservoir.